Definition
A grid tagging who is Responsible, Accountable, Consulted or Informed for each task or decision, with only one person ever Accountable.

Why it matters

The grid removes the silent assumption that someone else has a task covered. Without it, work falls through gaps, or two people do the same job and contradict each other. In a very small business the founder is every letter on everything, which works until the team grows. The first sign of outgrowing it is dropped work or repeated effort. A RACI on the handful of processes that recur makes a missed task trace to a name instead of a group chat.

How to apply it

  • List the recurring tasks or decisions that cause friction, not every task in the company.
  • Put exactly one Accountable on each row. Two accountable people means nobody is.
  • Keep the Consulted column short. Everyone consulted slows the decision, so consult only those whose input changes it.
  • Agree the grid with the people on it, then store it where they will see it, such as the same place as the standard operating procedure for that process.
  • Review it when a task keeps stalling or when someone joins or leaves.

What it is

RACI is a simple responsibility grid. Tasks or decisions run down one side, people or roles run across the top, and each cell holds one letter or stays empty. Responsible means doing the work, and several people can share it. Accountable means owning the outcome and having the final say, and only one person can hold it. Consulted means giving input before the decision. Informed means being told after it is made.

Common mistakes

  • Making everyone Informed on everything, which turns the grid into noise.
  • Leaving a row with no Accountable, or with the Accountable person unaware of it.
  • Writing it once and never updating it.
Worked example

Suppose a twelve-person agency handles client onboarding by whoever happens to notice the next step. Three steps slip every quarter, and nobody can say who should have done them. The founder draws a small RACI for that one process. The account manager is Responsible for the welcome call and the data request. The operations lead is Accountable for the checklist being complete, and only that person holds it. The designer is Consulted on the brief, and everyone else is Informed. The grid is stored beside the onboarding checklist in Trainual, so a new hire sees who owns each step on the first day. Within a month the missed steps stop, because every one traces back to a named person.

Tools in the example

Some links are affiliate links: we may earn a commission at no cost to you. It never decides a ranking. How we work with partners

  1. Article

    Accountability Chart

    The wider map of seats a RACI usually sits beside.

  2. Article

    Handoff

    The moment work passes between the people the grid names.

  3. Article

    Delegation

    Passing on ownership, which RACI makes explicit.

  4. Article

    Standard Operating Procedure (SOP)

    The written steps behind a task.